Home / Solutions / Generator Source Control & Testing
Application-led Solution

Generator Source Control & Testing

Coordinate generator start/stop, synchronism checking and scheduled testing with mains and generator transfer for continuous supply.

SOURCE A
TRANSFER
CONTROL
SOURCE B
CRITICAL LOADS
Solution Framework

Start with the application.

01

Confirm the source combination

Review mains/generator or generator/generator arrangements, source priority and the critical loads that determine the operating sequence.

02

Set the transfer method

Select open or closed transition, synchronism checking, voltage and frequency limits, and restoration behaviour for the confirmed sources.

03

Plan generator control and testing

Define start/stop commands, scheduled tests and dual-generator cyclic, priority or balanced run-time operation, with load management where required.

04

Support implementation

Provide product selection, integration guidance and technical training for industrial plants, commercial buildings and infrastructure.

Relevant Product Directions